Leading technology serving the world

0755-2732 9987

English
  • 中文
  • English

图片展示
业助报价

Industry assistance quotation

▂▂▂▂▂▂

 

1. After completing the quotation of the maintenance project, the maintenance assistant will countersign the order on the maintenance system.

2. For maintenance orders that are not quoted, the after-sales engineer will place the maintenance order in the system and the department head will countersign it.

业助报价

Industry assistance quotation

▂▂▂▂▂▂

 

1. After completing the quotation of the maintenance project, the maintenance assistant will countersign the order on the maintenance system.

2. For maintenance orders that are not quoted, the after-sales engineer will place the maintenance order in the system and the department head will countersign it.

R & D department drawing

▂▂▂▂▂▂

 

1. Maintenance order drawing can be completed within 3.5 hours.

2. For the maintenance list of the maintenance quotation, the time signed by the Trade Assistance Association shall be subject to the drawing within 3.5 hours.

3, the maintenance to modify the plan drawing sent to the customer within 2.5 hours to complete.

4, before 18:30 under the maintenance order, the day to complete the drawing work, after 18:30 not urgent maintenance order can be extended to the next morning processing, (special cases and Sunday do special treatment).

研发部出图
研发部出图

R & D department drawing

▂▂▂▂▂▂

 

1. Maintenance order drawing can be completed within 3.5 hours.

2. For the maintenance list of the maintenance quotation, the time signed by the Trade Assistance Association shall be subject to the drawing within 3.5 hours.

3, the maintenance to modify the plan drawing sent to the customer within 2.5 hours to complete.

4, before 18:30 under the maintenance order, the day to complete the drawing work, after 18:30 not urgent maintenance order can be extended to the next morning processing, (special cases and Sunday do special treatment).

生产加工

Production and processing

▂▂▂▂▂▂

 

1, in the process of production and processing, if there is an anomaly can not be completed on time, PMC should notify the after-sales supervisor one day in advance.

2. When the maintenance order cannot be completed on time, the maintenance team leader shall report the information to the department head, who will coordinate the work.

生产加工

Production and processing

▂▂▂▂▂▂

 

1, in the process of production and processing, if there is an anomaly can not be completed on time, PMC should notify the after-sales supervisor one day in advance.

2. When the maintenance order cannot be completed on time, the maintenance team leader shall report the information to the department head, who will coordinate the work.

Get parts

▂▂▂▂▂▂

 

1, the production department processing accessories by the production department. For example: valve needle, heating pipe, copper strip, package standard parts to be modified.

2, after-sales maintenance materials according to the "after-sales materials processing process" to complete the job

领取配件
领取配件

Get parts

▂▂▂▂▂▂

 

1, the production department processing accessories by the production department. For example: valve needle, heating pipe, copper strip, package standard parts to be modified.

2, after-sales maintenance materials according to the "after-sales materials processing process" to complete the job

热流道组装

Hot runner assembly

▂▂▂▂▂▂

 

1. The assembly of maintenance products is completed within 1.5 hours.

2, the maintenance team leader according to the actual needs to arrange the hot nozzle assembly, after the assembly of the maintenance products self-inspection, such as: product total height; Hot nozzle grounding and power-on detection; Test the heat.

3, maintenance products need to be delivered to the installation of the test mold within 3 hours to reach the client, after-sales engineers should inform the salesman to repair products to reach the customer time, the salesman can communicate with customers in advance to prepare for the test mold.

4, the repair products have a quote, the after-sales project in the delivery at the same time also to bring the delivery note, the delivery note signed by the client, on behalf of the maintenance product customer received, back to the company after the bottom of the single to the industry assistant.

5. When the maintenance products are sent to the customer, the maintenance team leader will pack the maintenance products at the door of the warehouse, and notify the industry assistant to arrange the shipment. For out-of-province maintenance of the shunt plate or the weight of more than 20KG of products must be packed in wooden cases, in the process of transportation can withstand the weight of the shunt plate and collision. The outlet part of the shunt plate and the space of the board should be more than 20MM to avoid the fixing screw of the shunt plate loosening and damaging the heating pipe. The maintenance products in the province can be packed in the actual situation to ensure that the parts will not be damaged during transportation.

图片展示

Contact us+

Add: Building 1, Qunfeng Industrial Park, No. 1 Liyuan Road, Fuyong Town, Bao 'an District, Shenzhen

Tel: 86-755-27329987 

Fax: 86-755-29599432 

E-mail:tshot@tengshhot.com

Copyright © 2004-223 Shenzhen TSHOT Hot Runner System Co., Ltd

图片展示

Contact us +

Add: Building 1, Qunfeng Industrial Park, No. 1 Liyuan Road, Fuyong Town, Bao 'an District, Shenzhen

Tel:+86-27329987 

Fax: +86-27329987 

E-mail:tshot@tengshhot.com

Copyright © 2004-223 Shenzhen TSHOT Hot Runner System Co., Ltd

添加微信好友,详细了解产品
使用企业微信
“扫一扫”加入群聊
复制成功
添加微信好友,详细了解产品
我知道了